next up previous contents
Next: SchedBlock Up: The Scheduling Block Previous: Control   Contents


Preconditions

The Preconditions panel specifies the conditions that must be met before this SB can be executed. None are probably yet used.



The ALMA OT Team, 2016 Mar 08