You are here:
Home
/
Documentation
/
ALMA Technical Notes
Search Site
only in current section
Advanced Search…
Log in
Register
Reset Password
Forgot Account
About
Organization
ALMA Basics
The ALMA Site
Live from Chajnantor
ALMA for the Public
Science
Cosmology and the high redshift Universe
Galaxies and galactic nuclei
ISM, star formation and astrochemistry
Planet-Forming Disks
Stellar evolution
Solar system
Proposing
Proposing Guidance
Cycle 7 Proposer’s Guide
Cycle 7 Capabilities
Sensitivity Calculator
Proposal Template
Duplicate Observations
ALMA Primer
Technical Handbook
DDT proposals
Observing
Phase 2
ToO activation
ALMA Status Page
Configuration Schedule
Present Schedule
Configuration Schedule: Cycles 7-9
SnooPI
High Priority Projects
Data
Archive
Archive Query Interface
Archive Documentation
Large Programs
Calibrator Catalogue
Science Verification
General Information
Available Data
Publication Acknowledgement
ARI-L
Processing
Science Pipeline
QA2 Data Products
CASA
Tools
Observing Tool
Sensitivity Calculator
CASA Simulator
OST
Atmospheric Models
Splatalogue
Toyama Microwave Atlas
Solar Ephemeris
Japanese Virtual Obs.
EU ARC network
Tools
I-TRAIN
Community-Developed
Radio Astro Tool
Documentation
Present Cycle
Previous Cycles
Help
Knowledgebase/FAQ
Helpdesk
EA ARC
EU ARC
NA ARC
Info
ALMA Technical Notes
(A Subset of Documents from the EOC Memo Series)
Technical
Note #
Title
Author
Release Date
1
Band-to-Band Phase Transfer with ALMA
K. Scott
2013 May 27
2
Spectral Scan testing update
C. Wilson
2014 Mar 30
3
Band 4 & 8 Imaging Verification Test Report
T. Sakoto
2014 May 30
4
ObsMode Summary Report
A. Remijan
2014 Jun 24
5
Proposed SV Targets for the Long Baseline Campaign - Additional Information
EOC Management
2014 Jun 24
6
Performance of H Maser During the EOC Week - 29 July to 03 Aug
A. Remijan
2014 Aug 03
7
The Effect of the Differential Antenna Height Term in the Delay Model
E. Fomalont
2014 Jul 31
8
Technical Description and Implementation of Band to Band Phase Transfer
E. Fomalont, V. Impellizzeri
2014 Aug 04
9
Preliminary Progress Report on the Implementation of the Bandwidth Transfer Technique for High Frequency Observations
J. Donovan Meyer
2014 Aug 08
10
Progress on the Implementation of the Bandwidth Transfer Technique for High Frequency Observations - Report #2
B. Mason
2014 Sep 03
11
General Considerations and Observing Scenario for Bandwidth Switching Observing Mode
B. Mason
2014 Sep 04
12
Preliminary Progress Report on the High Frequency Single-Dish Sideband Separation
J. Chibueze
2014 Aug 12
13
Consideration to the Correction Factor for Single-Dish Observations with the ACA Correlator
S. Kameno
2014 Oct 26
14
Preliminary summary of ACA Testing Campaign
S. Kameno, T. Kamazaki
2014 Oct 17
15
ALMA Cross Correlation Bandpass Stability
S. Kameno
2014 Dec 17
16
Summary of the First ALMA Phasing Project (APP) Commissioning and Science Verification Mission: 2015 January 6-13
L. D. Matthews, G. B. Crew
2015 March 29
17
Summary of the Second ALMA Phasing Project (APP)
Commissioning and Science Verification Mission: 2015 March 24-30
L. D. Matthews, G. B. Crew
2015 Oct 28
18
Summary of the Third ALMA Phasing Project (APP)
Commissioning and Science Verification Mission:
2015 July 28 - August 3
L. D. Matthews
G. B. Crew
2015 Oct 28
19
Summary of the Fourth ALMA Phasing Project (APP) Commissioning and Science Verification Mission: 2016 April 3-8
L. D. Matthews, G. B. Crew,
V. L. Fish
2017 March 28