Configuration Schedule

 Cycle 6 - by Block

BlockStart dateEnd datePurpose

Approx 
Config.

min - max
baseline
(m)

beam1
(")

maximum
recoverable
scale1
(")

1 2018-10-01 2018-10-08 PI (Observing Report) C43-6 15-2500 0.31" 4.1"
2 2018-10-08 2018-10-15 PI (Observing Report) C43-6 15-2500 0.31" 4.1"

 

1Note: the synthesized beam and maximum recoverable scale are tabulated for a frequency of 100 GHz. To calculate these quantities for a given frequency (measured in GHz), multiply the tabulated values by (100 / frequency).

 

Complete Cycle 6 Configuration Schedule

Start dateEnd dateConfigmin - max
baseline
(m)
beam
(")1
maximum
recoverable
scale
(")1
2018-10-01 2018-10-14 C43-6 15-2500 0.31" 4.1"
2018-10-15 2018-11-24 C43-5 15-1400 0.54" 6.7"
2018-11-25 2018-12-14 C43-4 15-784 0.92" 11.2"
2018-12-15 2019-01-04 C43-3 15-500 1.4" 16.2"
2019-01-05 2019-01-20 C43-2 15-314 2.3" 22.6"
2018-01-20 2019-02-01 C43-1 15-161 3.4" 29.0"
2019-02-01 2019-02-28 February Maintenance Period
2019-03-01 2019-03-14 C43-1 15-161 3.4" 29.0"
2019-03-15 2019-03-31 C43-2 15-314 2.3" 22.6"
2019-04-01 2019-04-14 C43-3 15-500 1.4" 16.2"
2019-04-15 2019-04-30 C43-4 15-784 0.92" 11.2"
2019-05-01 2019-05-31 Antennae Relocation Shutdown
2019-06-01 2019-06-19 C43-10 244-16200 0.042" 0.50"
2019-06-20 2019-07-09 C43-9 368-13900 0.057" 0.81"
2019-07-10 2019-07-31 C43-8 110-8500 0.096" 1.4"
2019-08-01 2019-09-04 C43-7 64-3600 0.21" 2.6"
2019-09-05 2019-09-30 C43-6 15-2500 0.31" 4.1"

NOTE: The Configuration Schedule is SUBJECT TO CHANGE.

 

Link to Configuration Schedules From Prior Cycles