Configuration Schedule
Cycle 8 2021 - by Block
Block | Start date | End date | Purpose |
Approx |
min - max |
beam1 |
maximum |
---|---|---|---|---|---|---|---|
1 | 2021-10-01 | 2021-10-11 | PI (Observing Report) | C-8 | 110-8500 | 0.096" | 1.4" |
2 | 2021-10-11 | 2021-10-18 | PI (Observing Report) | C-8 | 110-8500 | 0.096" | 1.4" |
3 | 2021-10-18 | 2021-10-25 | PI (Observing Report) | C-8 | 110-8500 | 0.096" | 1.4" |
4 | 2021-10-25 | 2021-11-01 | PI (Observing Report) | C-8 | 110-8500 | 0.096" | 1.4" |
5 | 2021-11-01 | 2021-11-08 | PI (Observing Report) | C-7 | 64-3600 | 0.21" | 2.6" |
6 | 2021-11-08 | 2021-11-15 | PI (Observing Report) | C-7 | 64-3600 | 0.21" | 2.6" |
7 | 2021-11-15 | 2021-11-22 | PI (Observing Report) | C-7 | 64-3600 | 0.21" | 2.6" |
8 | 2021-11-22 | 2021-11-29 | PI (Observing Report) | C-7 | 64-3600 | 0.21" | 2.6" |
9 | 2021-11-29 | 2021-12-06 | PI (Observing Report) | C-6 | 15-2500 | 0.31" | 4.1" |
10 | 2021-12-06 | 2021-12-13 | PI (Observing Report) | C-6 | 15-2500 | 0.31" | 4.1" |
11 | 2021-12-13 | 2021-12-20 | PI (Observing Report) | C-5 | 15-1400 | 0.54" | 6.7" |
12 | 2021-12-20 | 2021-12-27 | PI (Observing Report) | C-4 | 15-784 | 0.92" | 11.2" |
13 | 2021-12-27 | 2022-01-03 | PI (Observing Report) | C-4 | 15-784 | 0.92" | 11.2" |
14 | 2022-01-03 | 2022-01-10 | PI (Observing Report) | C-4 | 15-784 | 0.92" | 11.2" |
15 | 2022-01-10 | 2022-01-17 | PI (Observing Report) | C-4 | 15-784 | 0.92" | 11.2" |
16 | 2022-01-17 | 2022-01-24 | PI (Observing Report) | C-3 | 15-500 | 1.4" | 16.2" |
17 | 2022-01-24 | 2022-02-01 | PI (Observing Report) | C-3 | 15-500 | 1.4" | 16.2" |
18 | 2022-03-01 | 2022-03-07 | PI (Observing Report) | C-1 | 15-161 | 3.4" | 29.0" |
19 | 2022-03-07 | 2022-03-14 | PI (Observing Report) | C-1 | 15-161 | 3.4" | 29.0" |
20 | 2022-03-14 | 2022-03-21 | PI (Observing Report) | C-1 | 15-161 | 3.4" | 29.0" |
21 | 2022-03-21 | 2022-03-28 | PI (Observing Report) | C-2 | 15-314 | 2.3" | 22.6" |
22 | 2022-03-28 | 2022-04-04 | PI (Observing Report) | C-2 | 15-314 | 2.3" | 22.6" |
23 | 2022-04-04 | 2022-04-11 | PI (Observing Report) | C-2 | 15-314 | 2.3" | 22.6" |
24 | 2022-04-11 | 2022-04-18 | PI (Observing Report) | C-2 | 15-314 | 2.3" | 22.6" |
25 | 2022-04-18 | 2022-04-25 | PI (Observing Report) | C-3 | 15-500 | 1.4" | 16.2" |
26 | 2022-04-25 | 2022-05-02 | PI (Observing Report) | C-3 | 15-500 | 1.4" | 16.2" |
27 | 2022-05-02 | 2022-05-09 | PI (Observing Report) | C-3 | 15-500 | 1.4" | 16.2" |
28 | 2022-05-09 | 2022-05-16 | PI (Observing Report) | C-3 | 15-500 | 1.4" | 16.2" |
29 | 2022-05-16 | 2022-05-23 | PI (Observing Report) | C-3 | 15-500 | 1.4" | 16.2" |
30 | 2022-05-23 | 2022-05-30 | PI (Observing Report) | C-4 | 15-784 | 0.92" | 11.2" |
31 | 2022-05-30 | 2022-06-06 | PI (Observing Report) | C-4 | 15-784 | 0.92" | 11.2" |
32 | 2022-06-06 | 2022-06-13 | PI (Observing Report) | C-4 | 15-784 | 0.92" | 11.2" |
33 | 2022-06-13 | 2022-06-20 | PI (Observing Report) | C-4 | 15-784 | 0.92" | 11.2" |
34 | 2022-06-20 | 2022-06-27 | PI (Observing Report) | C-5 | 15-1400 | 0.54" | 6.7" |
35 | 2022-06-27 | 2022-07-04 | PI (Observing Report) | C-5 | 15-1400 | 0.54" | 6.7" |
36 | 2022-07-04 | 2022-07-11 | PI (Observing Report) | C-5 | 15-1400 | 0.54" | 6.7" |
37 | 2022-07-11 | 2022-07-18 | PI (Observing Report) | C-6 | 15-2500 | 0.31" | 4.1" |
38 | 2022-07-18 | 2022-07-25 | PI (Observing Report) | C-6 | 15-2500 | 0.31" | 4.1" |
39 | 2022-07-25 | 2022-08-01 | PI (Observing Report) | C-6 | 15-2500 | 0.31" | 4.1" |
40 | 2022-08-01 | 2022-08-08 | PI (Observing Report) | C-5 | 15-1400 | 0.54" | 6.7" |
41 | 2022-08-08 | 2022-08-15 | PI (Observing Report) | C-5 | 15-1400 | 0.54" | 6.7" |
42 | 2022-08-15 | 2022-08-22 | PI (Observing Report) | C-5 | 15-1400 | 0.54" | 6.7" |
1Note: the synthesized beam and maximum recoverable scale are tabulated for a frequency of 100 GHz. To calculate these quantities for a given frequency (measured in GHz), multiply the tabulated values by (100 / frequency).
2LBR = Long Baseline Reconfiguration. ACA and Total Power Observations only.
Complete Tentative Cycle 8 2021 Configuration Schedule1
Start date | Config | min - max baseline (m) |
beam (")1 |
maximum recoverable scale (")1 |
---|---|---|---|---|
2021-10-01 | C-8 | 110-8500 | 0.096" | 1.4" |
2021-10-20 | C-7 | 64-3600 | 0.21" | 2.6" |
2021-11-20 | C-6 | 15-2500 | 0.31" | 4.1" |
2021-12-01 | C-5 | 15-1400 | 0.54" | 6.7" |
2021-12-20 | C-4 | 15-784 | 0.92" | 11.2" |
2022-01-10 | C-3 | 15-500 | 1.4" | 16.2" |
2022-02-01 | February Maintenance Period | |||
2022-03-01 | C-1 | 15-161 | 3.4" | 29.0" |
2022-03-20 | C-2 | 15-314 | 2.3" | 22.6" |
2022-04-20 | C-3 | 15-500 | 1.4" | 16.2" |
2022-05-20 | C-4 | 15-784 | 0.92" | 11.2" |
2022-06-20 | C-5 | 15-1400 | 0.54" | 6.7" |
2022-07-11 | C-6 | 15-2500 | 0.31" | 4.1" |
2022-07-30 | C-5 | 15-1400 | 0.54" | 6.7" |
2022-08-20 | C-4 | 15-784 | 0.92" | 11.2" |
2022-09-10 | C-3 | 15-500 | 1.4" | 16.2" |
1NOTE: The Configuration Schedule is SUBJECT TO CHANGE.
Link to Cycle 9 - 11 Configuration Schedules