Configuration Schedule

 Cycle 8 2021 - by Block

 

BlockStart dateEnd datePurpose

Approx 
Config.

min - max
baseline
(m)

beam1
(")

maximum
recoverable
scale1
(")

1 2021-10-01 2021-10-11 PI (Observing Report) C-8 110-8500 0.096" 1.4"
2 2021-10-11 2021-10-18 PI (Observing Report) C-8 110-8500 0.096" 1.4"
3 2021-10-18 2021-10-25 PI (Observing Report) C-8 110-8500 0.096" 1.4"
4 2021-10-25 2021-11-01 PI (Observing Report) C-8 110-8500 0.096" 1.4"
5 2021-11-01 2021-11-08 PI (Observing Report) C-7 64-3600 0.21" 2.6"
6 2021-11-08 2021-11-15 PI (Observing Report) C-7 64-3600 0.21" 2.6"
7 2021-11-15 2021-11-22 PI (Observing Report) C-7 64-3600 0.21" 2.6"

 

1Note: the synthesized beam and maximum recoverable scale are tabulated for a frequency of 100 GHz. To calculate these quantities for a given frequency (measured in GHz), multiply the tabulated values by (100 / frequency).

2LBR = Long Baseline Reconfiguration. ACA and Total Power Observations only.

 

Complete Tentative Cycle 8 2021 Configuration Schedule1

Start dateConfigmin - max
baseline
(m)
beam
(")1
maximum
recoverable
scale
(")1
2021-10-01 C-8 110-8500 0.096" 1.4"
2021-10-20 C-7 64-3600 0.21" 2.6"
2021-11-20 C-6 15-2500 0.31" 4.1"
2021-12-01 C-5 15-1400 0.54" 6.7"
2021-12-20 C-4 15-784 0.92" 11.2"
2022-01-10 C-3 15-500 1.4" 16.2"
2022-02-01 February Maintenance Period
2022-03-01 C-1 15-161 3.4" 29.0"
2022-03-20 C-2 15-314 2.3" 22.6"
2022-04-20 C-3 15-500 1.4" 16.2"
2022-05-20 C-4 15-784 0.92" 11.2"
2022-06-20 C-5 15-1400 0.54" 6.7"
2022-07-11 C-6 15-2500 0.31" 4.1"
2022-07-30 C-5 15-1400  0.54" 6.7"
2022-08-20 C-4 15-784 0.92" 11.2"
2022-09-10 C-3 15-500 1.4" 16.2"

1NOTE: The Configuration Schedule is SUBJECT TO CHANGE.

 

 