You are here: Home / Observing / Configuration Schedule

Configuration Schedule

 Cycle 7 - by Block

BlockStart dateEnd datePurpose

Approx 
Config.

min - max
baseline
(m)

beam1
(")

maximum
recoverable
scale1
(")

1 2019-09-30 2019-10-07 PI (Observing Report) C43-4 15-784 0.92" 11.2"
2 2019-10-07 2019-10-14 PI (Observing Report) C43-4 15-784 0.92" 11.2"
3 2019-10-14 2019-10-21 PI (Observing Report) C43-4 15-784 0.92" 11.2"
4 2019-10-21 2019-10-28 PI (Observing Report) C43-3 15-500 1.4" 16.2"
5 2019-10-28 2019-11-04 PI (Observing Report) C43-3 15-500 1.4" 16.2"
6 2019-11-04 2019-11-11 PI (Observing Report) C43-3 15-500 1.4" 16.2"
7 2019-11-11 2019-11-18 PI (Observing Report) C43-3 15-500 1.4" 16.2"
8 2019-11-18 2019-11-25 PI (Observing Report) C43-2 15-314 2.3" 22.6"
9 2019-11-25 2019-12-02 PI (Observing Report) C43-2 15-314 2.3" 22.6"

 

1Note: the synthesized beam and maximum recoverable scale are tabulated for a frequency of 100 GHz. To calculate these quantities for a given frequency (measured in GHz), multiply the tabulated values by (100 / frequency).

2LBR = Long Baseline Reconfiguration. ACA and Total Power Observations only.

 

Complete Cycle 7 Configuration Schedule

Start dateConfigmin - max
baseline
(m)
beam
(")1
maximum
recoverable
scale
(")1
2019-10-01 C43-4 15-784 0.92" 11.2"
2019-10-20 C43-3 15-500 1.4" 16.2"
2019-11-10 C43-2 15-314 2.3" 22.6"
2019-11-30 C43-1 15-161 3.4" 29.0
2019-12-20 C43-2 15-314 2.3" 22.6"
2020-01-10 C43-3 15-500 1.4" 16.2"
2020-02-01 February Maintenance Period
2020-03-01 C43-4 15-784 0.92" 11.2"
2020-03-20 C43-5 15-1400
0.54" 6.7"
2020-04-24 C43-6 15-2500 0.31" 4.1"
2020-05-27 C43-7 64-3600 0.21" 2.6"
2020-06-20 C43-8 110-8500 0.096" 1.4"
2020-07-11 C43-9 368-13900 0.057" 0.81"
2020-07-30 C43-10 244-16200 0.042" 0.50"
2020-08-20 C43-9 368-13900 0.057" 0.81"
2020-09-10 C43-8 110-8500 0.096" 1.4"

NOTE: The Configuration Schedule is SUBJECT TO CHANGE.

 

Link to Cycle 7 - 9 Configuration Schedules

 

Link to Configuration Schedules From Prior Cycles